What did we do?
Project Description
Break through and cut out existing partition walls to create door opening
Make good using metal stuid with timber infills to form solid door opening
Supply and install temporary fire rated door frame
Re-instate suspended ceiling frid and tiles
Supply and install new metal framed suspended ceiling complete with plasterboard
Tape and joint
Installation of disabled toilet